GOAL: Install approximately 8,400 feet of pipeline; Move water supplies in the Main San Gabriel Valley Basin under the terms of a Storage and Export Agreement between Puente Basin Water Agency and the Main San Gabriel Basin Watermaster

The Agency is developing this project to ensure that Cal Domestic Project facilities, currently being utilized to move stored water from the Main San Gabriel Basin, can be maximized for the benefit of both Districts.

Puente Basin Water Agency https://puentebasin.com
Puente Basin Water Agency https://puentebasin.com

PROJECT FACILITIES

The project consists of the installation of approximately 8,400 feet of 20-inch diameter cement mortar lined and coated steel pipe, and up to four metered intertie structures between Rowland’s existing pipeline in Colima.

Annual Yield: Up to 1,856 Acre Feet

Supply: Six Basins

Stored water previously purchased by the Districts (MWD untreated water) and stored in the Main San Gabriel Valley Basin under the terms of a Storage and Export Agreement between Puente Basin Water Agency and the Main San Gabriel Basin Watermaster. Water will be produced through the Cal Domestic Project Facilities.

Status: Completion in 2018

The 20-inch pipeline currently under design. Design is approximately 90 percent complete. Design anticipated to be complete by end of 2017. Locations of interties being determined.